Our Services
Overview
It's fast and cheaper to it do this way than taking out all your floors. Our milling machines allows you to install underfloor heating in any existing floor.
Suitable for many types of floors, including existing tiled floors. No need for a floor screed as the top floor can be laid directly onto the sealed slots.
Underfloor heating in Shannon can be installed in 2-3 days at most. Virtually low-dust milling thanks to high-quality extraction equipment. The easiest way to install underfloor heating in an existing screed, concrete or tiled floor, is by milling slots. This avoids unnecessary floor structures or having to chip out the slots.
FAQ's
Energy Testing Carried Out By Us in Shannon
Recent test during the Xmas period of the month of December 2021, House "A" with BER rate of C1, detached, 14kw heat pump, 190m2 with the underfloor milling retrofit was €172 including all house appliances using electricity. House "B" with BER rate of B3, semi-detached, 24kw gas boiler, 130m2 with rads was €247 gas & electricity including all house appliances.
Move Exciting results coming soon.